Time to catch up on documentation. We've been hinging (and unhinged!) for the last few days.
In this photo, we are still working the upper wing/cowling hinge. The bottom half of the hinge has been located. We marked the hinge line, then trimmed the flange along that line. We duct taped the flange and did a 5-bid layup on the cowling so that the hinge pieces will be properly aligned. |